Fire Department NOC — Regulatory Liaison & Approvals
Governed under State Fire Service Act / National Building Code (NBC) 2016 Part 4
Official Certificates & Documents Issued
Step-by-Step Approval & Liaison Workflow
Our structured 4-phase engagement model eliminates bottlenecks and guarantees timely clearance.
Step 1: Fire Risk Audit
Evaluate industrial hazard classification (Light, Ordinary, or High Hazard).
Step 2: Drawing Submission
File fire schematic layout with the District Fire Officer (DFO).
Step 3: System Testing & Demo
Demonstrate live pressure testing of wet risers, pumps, and evacuation drills during inspection.
Step 4: NOC Issuance
Receive authenticated Fire NOC with compliance conditions.
Documents Required from Applicant
- Site plan and sectional building elevations showing fire exits and setbacks
- Fire fighting equipment layout (hydrants, hose reels, fire pumps, alarms)
- Structural stability certificate and building occupancy classification
- Water storage capacity calculations (Underground and overhead tanks)
Frequently Asked Questions regarding Fire Department NOC
1What is the expected turnaround timeline to secure Fire Department NOC in Andhra Pradesh?
The statutory SLA timeline is approximately 15–25 Business Days, subject to timely portal documentation submission via the AP Single Desk / Central Nodal portal and successful verification during departmental scrutiny.
2Which nodal government authority oversees Fire Department NOC?
This approval is regulated by State Disaster Response & Fire Services Department under the legal framework of State Fire Service Act / National Building Code (NBC) 2016 Part 4.
3What core documents are required for filing Fire Department NOC?
Primary mandatory documents include: Site plan and sectional building elevations showing fire exits and setbacks, Fire fighting equipment layout (hydrants, hose reels, fire pumps, alarms), Structural stability certificate and building occupancy classification, Water storage capacity calculations (Underground and overhead tanks).
4How does Harveni Group assist industrial enterprises in Andhra Pradesh & India?
Harveni Group provides turnkey advisory: from technical dossier preparation, architectural/engineering drawings, online filing on departmental portals, to direct liaison with scrutiny officers, resolving queries, and facilitating physical site inspections across Sri City, Visakhapatnam, Vijayawada, Tirupati, and industrial zones.
Factory, Fire & Industrial Safety Compliance
Factory plan approvals, DISH licenses, Fire NOCs (1/3/5 years), Form 8 pressure vessels, and boiler registrations.