Project Planning & Infrastructure Approvals
Core technical, electrical, and structural infrastructure clearances required before industrial construction and commissioning. We prepare bankable Detailed Project Reports (DPR), coordinate CEIG and DISCOM permissions for high-tension (HT) power lines and dedicated transformer substations, secure bulk industrial water supply allocations, and provide vetted structural stability certificates.
Need Help With This Division?
Share your requirement and our team will get in touch with you.
All 5 Dedicated Services Under Division 04
Each clearance has a dedicated statutory workflow, prescribed document checklist, timeline, and competent authority submission path.
DPR Preparation
Bankable Detailed Project Reports for debt syndication, subsidies, and government clearances.
Electricity HT Line & Transformer Installation
11kV/33kV HT power sanction, transformer drawing approval, CEIG inspection, and energization.
Water Board Approvals
Bulk industrial water allocation, pipeline tapping sanction, and groundwater abstraction permissions.
Structural Plans
RCC & PEB structural engineering design, wind/seismic analysis, and certified design vetting.
Factory Drawing Approval & Factory Drawing Preparation
Specialized 1:100 scale factory architectural and safety drawings aligned with DISH regulations.
Stability Certificate from Competent Engineer
Form 1-A / Form 2 Certificate of Structural Stability issued by DISH-recognized Competent Persons.
Core Compliance Framework
- Bank-grade Detailed Project Reports (DPR) with 10-year financial cash flow modeling
- CEIG statutory statutory clearance for 11kV/33kV HT lines & industrial transformers
- Bulk water drawal approvals from State Water Boards and municipal pipelines
- Chartered Engineer Structural Stability Certificates under Factories Act Section 6
