Statutory Clearances Desk
Harveni Group of Consultancy Services Pvt. Ltd.
DIV 04 · STATUTORY CLEARANCESLA: 12–20 Business Days

Structural Plans

Complete structural engineering design and calculations for heavy industrial sheds, pre-engineered buildings (PEB), reinforced cement concrete (RCC) structures, and machine foundation blocks. Certified by Registered Structural Engineers adhering to IS codes, seismic zone standards, and wind speed loads.

Competent Authority
Urban Development Authorities / Municipal Town Planning / Registered Structural Engineers
Governing Legislation
National Building Code (NBC) 2016 & Bureau of Indian Standards (IS 456, IS 800, IS 1893)
Fast Track ProcessingStatutory Audit ProofDirect Departmental Liaison
FAST STATUTORY DESK20–30s Enquiry

Need Help With This Service?

Share your requirement and our team will get in touch with you.

01 Requirement
02 Contact
03 Submit
STEP 01 OF 03

Tell Us About Your Requirement

Structural Plans
Division: Project Planning & Infrastructure Approvals
Structural Plans Industrial Clearance Documentation
Urban Development Authorities / Municipal Town Planning / Registered Structural Engineers

Structural Plans — Regulatory Liaison & Approvals

Governed under National Building Code (NBC) 2016 & Bureau of Indian Standards (IS 456, IS 800, IS 1893)

Deliverables & Sanctions

Official Certificates & Documents Issued

Detailed Structural Working Drawings (Foundations, Columns, Beams, Trusses)
STAAD.Pro / ETABS Structural Analysis & Seismic Safety Calculation Report
Structural Engineer Certificate of Design Adequacy
Execution Methodology

Step-by-Step Approval & Liaison Workflow

Our structured 4-phase engagement model eliminates bottlenecks and guarantees timely clearance.

1

Step 1: Load Modeling

Model structural geometry and load cases including seismic and wind forces in software.

2

Step 2: Optimization

Design steel sections and RCC member dimensions for structural efficiency and safety.

3

Step 3: Detail Drafting

Produce fabrication drawings, rebar schedules, and joint connection details.

4

Step 4: Certification

Licensed structural engineer stamps structural drawings for building permit submission.

Statutory Compliance Checklist

Documents Required from Applicant

  • Geotechnical soil investigation report (Safe Bearing Capacity of soil)
  • Architectural layout and operational clearance requirements
  • Live loads, dead loads, and overhead crane capacity (EOT crane tonnages)
  • Equipment static and dynamic load distributions
Statutory FAQ & Scrutiny Advisory

Frequently Asked Questions regarding Structural Plans

1What is the expected turnaround timeline to secure Structural Plans in Andhra Pradesh?

The statutory SLA timeline is approximately 12–20 Business Days, subject to timely portal documentation submission via the AP Single Desk / Central Nodal portal and successful verification during departmental scrutiny.

2Which nodal government authority oversees Structural Plans?

This approval is regulated by Urban Development Authorities / Municipal Town Planning / Registered Structural Engineers under the legal framework of National Building Code (NBC) 2016 & Bureau of Indian Standards (IS 456, IS 800, IS 1893).

3What core documents are required for filing Structural Plans?

Primary mandatory documents include: Geotechnical soil investigation report (Safe Bearing Capacity of soil), Architectural layout and operational clearance requirements, Live loads, dead loads, and overhead crane capacity (EOT crane tonnages), Equipment static and dynamic load distributions.

4How does Harveni Group assist industrial enterprises in Andhra Pradesh & India?

Harveni Group provides turnkey advisory: from technical dossier preparation, architectural/engineering drawings, online filing on departmental portals, to direct liaison with scrutiny officers, resolving queries, and facilitating physical site inspections across Sri City, Visakhapatnam, Vijayawada, Tirupati, and industrial zones.

PART OF STATUTORY DIVISION 04

Project Planning & Infrastructure Approvals

Bankable DPRs, HT electricity line & transformer approvals, Water Board permits, structural drawings, and stability certificates.

Direct Expert Liaison

Need Immediate Filing or Clearance for this License?

Send your project requirements directly to our industrial compliance secretariat for an immediate document audit and fee quote.